Loading..
Projects from newest
G62 R842/4 Improvement of Al Khail Road
July 2009 - Jan 2010
- Location
- Al Khail Road / Umm Suqeim
- Main Contractor
- Wade Adams Contracting
- Consultant
- Cansult Maunsell
- Scope
- Bridge Piling Works
G-60 Muscat Oasis Phase IV
August 2009 - January 2010
- Location
- Muscat / Oman
- Main Contractor
- Allied Business Corporation
- Consultant
- Baalawi Engineering Consultancy
- Scope
- Shoring with Secant Piles
G59 - Al Khaleej Sugar Molasses Pit
June 2009 - Jan 2010
- Location
- Jebel Ali Free Zone
- Main Contractor
- Geomar Gulf LLC
- Consultant
- Al Rayan Consulting
- Scope
- Shoring with Secant Piles
G58 - Limitless Downtown Jebel Ali (Z1B2 - MIX01 - 04)
March 2009 - May 2009
- Location
- Jebel Ali
- Main Contractor
- Taisei Corporation
- Consultant
- Cassia
- Scope
- Sheet Pile Works
G57 - Wade Adams - Palm Jumaeriah Gateway Towers
January 2009 - March 2009
- Location
- Palm Jumeirah
- Main Contractor
- Wade Adams
- Consultant
- Parsons De Leuw Cather Overseas Ltd
- Scope
- 100cm and 220cm diameter pier foundations of new bridge structure, Length: 32m
G56 - Arabian Ranches Interchange Bridge MC-1
Dec 2008 - Jan 2009
- Location
- Arabian Ranches
- Main Contractor
- Taisei Corporation
- Consultant
- Parsons De Leuw Cather Overseas Ltd
- Scope
- 100 cm diameter pier foundations of new bridge structure non-working piles
G55 - Improvement of Emirates road Stage 2 - Phase 1(R902-1)
September 2008 - April 2009
- Location
- Barsha Interchange Emirates Road
- Main Contractor
- China State Construction
- Consultant
- Wilbur Smith
- Scope
- 995 Bored Piles
G54 - Dubai Creek Crossing 7th Crossing Corridor (R777/4A)
September 2008 - November 2008
- Location
- Bur Dubai Side
- Main Contractor
- Wade Adams Contracting LLC
- Consultant
- Parsons De Leuw, Cather Overseas Limited
- Scope
- Sheet Piling Works
G53 - Residential Building (B+G+5P+40) Plot No. R-02, Verde Tower
September 2008 - Under Construction
- Location
- Dubai Maritime City
- Main Contractor
- Geomar Gulf LLC
- Consultant
- John R Harris & Partners (JRHP)
- Scope
- Shoring 80cm contiguous pile max. exc. -7.90m.
Steel profiles max. exc.-4.90m.
G52 - Emirates Road Junction Project No. R842/1
September 2008 - February 2009
- Location
- Al Khail Road
- Main Contractor
- Emirates Road Contractong LLC
- Consultant
- Cansult Maunsell / Aecom
- Scope
- Piling 120cm and 100cm diameter at the pier foundations of new bridge structure non-working piles.
G51 - Proposed Office Building Plot No. 373-1136
Design in progress
- Location
- Al Barsha First
- Main Contractor
- Al Mazrouei Bowyer Building (AMBB)
- Consultant
- Arif & Bintoak
- Scope
- Shoring 100cm with 1 row anchor
75cm centlever and 75cm with row anchor (max. exc. -11.93m and -12.45m)
G49 - Proposed (4B+G+7) Biulding Plot No. P1.A014
April 2010 - Under Construction
- Location
- Culture Village
- Main Contractor
- Al Shafar Transport & Contracting Co.
- Consultant
- Al Asri Engineering Consultant
- Scope
- Shoring with 90 cm secant piles and ground anchors (exc. height = 15.30 m)
G48 - Proposed (3B+G+3P+26) Tower Plot No. 600-7728
Sep 2008 - Under Construction
- Location
- Nad Al Shiba
- Main Contractor
- Al Shafar Transport & Contracting Co.
- Consultant
- Design Center Architects & Engineers Consultants
- Scope
- Shoring with 90 cm secant piles and ground anchors (exc. height = 15.75 m)
G47 - First Gulf Bank, Jebel Ali Branch Plot No. MO0696
Design in progress
- Location
- Jebel Ali
- Main Contractor
- Shiryan Contracting
- Consultant
- M.B.A Engineering Consultancy
- Scope
- Shoring with steel profiles
Ground anchors & 60 cm secant pile as cantilever (exc. height =4.85 & 8.15 meter)
Bored piles with 50 & 80 cm L=11 m
G46 - Fortunato Development
Apr 2008 - May 2008
- Location
- Jumeirah Village
- Main Contractor
- Saqer Engineering
- Consultant
- Whitby & Bird Engineering
- Scope
- Shoring with steel profiles
G45 - (2B+G+6) Commercial Building Plot No. B/P41
May 2008 - Aug 2008
- Location
- Dubai Healtcare City
- Main Contractor
- Geomar Gulf LLC
- Consultant
- Adnan Saffarini Consultant
- Scope
- Shoring with 60 cm contiguous piles and ground anchors (exc. height = 8.50 m)
G44 - (2B+G+14) Proposed Building Plot No. 373-1233
Feb 2008 - Mar 2008
- Location
- Al Barshaa First
- Main Contractor
- Ost Construction Projects
- Consultant
- Al Suweidi Consultants
- Scope
- Shoring with steel profiles
Ground anchors & 60 cm contiguous pile (exc. height =8.0 m)
G43 - Al Rostamani Maze Tower (G+10) Car Park Building Plot No. 336-196
Feb 2008 - May 2008
- Location
- Trade Center Second
- Project Management
- Mace Group
- Main Contractor
- Al Rostamani Pegel LLC
- Consultant
- Design and Architecture Bureau Consulting Architects and Engineers
- Scope
- Bored piles with 75 & 90 cm L= 21 meter
G42 - (B+G+M+1) Commercial Building Plot No. 364-629
Apr 2008
- Location
- Al Quoz Ind. First
- Main Contractor
- Al Sayegh Contracting Llc
- Consultant
- Adt Consultancy
- Scope
- Shoring with steel profiles
G40 - Dubai Metro- Al Rigga Cooiling Plant (DM-02)
Dec 2007 - Mar 2008
- Location
- Al Rigga
- Main Contractor
- Geomar Gulf LLC
- Consultant
- Adnan Saffarini Consultant
- Scope
- Shoring with 90 cm secant piles and ground anchor (exc. height = 10.7 meter)
G39 - Proposed (3B+G+1) Story Office Building Plot No. 262-1991
May 2008- Aug 2008
- Location
- Mizher First
- Main Contractor
- Jamal Al Ghurair Est.
- Consultant
- Hisham Lahham Consultant
G37 - Residental Building (B+G+11) Plot No. 124-531
Dec 2007
- Location
- Al Muraqabat
- Main Contractor
- Al Mazrouei Bowyer Building (AMBB)
- Consultant
- Arif & Bintoak Consultant
- Scope
- Shoring with steel profiles
60 cm contiguous piles
G36 - Proposed Buil. (2B (4Lvl)+G+16+HC) Plot No. C007-008
Dec 2007 - May 2008
- Location
- Tecom
- Main Contractor
- Saqer Engineering
- Consultant
- Adnan Saffarini Consultant
- Scope
- Shoring with steel profiles
80 cm contiguous piles