Projects from newest
G17 - B+G+13+R Residential Tower Plot No. C-003-009
Jun 2006 - Jul 2006
- Location
- Tecom Area C
- Main Contractor
- Al Yarmook Contracting
- Consultant
- Al Ajmi Consultants
- Scope
- Bored piles with 50 & 80 & 90 cm L= 11 meter
Pile Load Tests, dynamic & integrity tests
G16 - 4B+G+44 Comm. / Office Building Plot No. I2
Oct 2006 - Jun 2007
- Location
- Jumeriah Lake Towers
- Main Contractor
- Al Shafar Transport & Contracting Co.
- Consultant
- Design and Architecture Bureau Consulting Architects and Engineers
- Scope
- Shoring with 80 cm contiguous piles and ground anchors
Bored piles with 120 cm & 75 cm L=30 meter
G15 - B+G+11+R Commercial & Residential Building Plot No. 241-497
May 2006
- Location
- Al Nahda Second
- Main Contractor
- Al Yarmook Contracting
- Consultant
- Al Ajmi Consultants
- Scope
- Shoring with steel profiles
G14 - 3B+G+8+HC Residential Building Plot No. 373-1232
Mar 2006 - May 2006
- Location
- Al Barshaa First
- Main Contractor
- Geomar Gulf LLC
- Consultant
- National Engineering Bureau
- Scope
- Shoring with 75 cm contiguous piles and ground anchors (exc height = 13.0 meter)
G13 - 2B+G+4 Office Building Plot No. A-009-009
Mar 2006
- Location
- Dubai Media City
- Main Contractor
- Central Contracting LLC
- Consultant
- Al Maktab Al Asri Eng. Consultant
- Scope
- Bored piles with 50 & 60 & 75 cm L= 9 meter
G12 - 2B+G+8+Gym Residential Building Plot No. 373-1261
Mar 2006 - Apr 2007
- Location
- Al Barshaa First
- Main Contractor
- Al Shafar Transport & Contracting Co.
- Consultant
- Al Maktab Al Asri Eng. Consultant
- Scope
- Shoring with 50 cm contiguous piles (exc. height = 8.0 meter)
G11 - Barsha Hotel Project Plot No. 373-1308
Dec 2005 - Feb 2006
- Location
- Al Barshaa First
- Main Contractor
- Al Fara'A Gen. Contracting Co.
- Consultant
- Adnan Safarini Design, Supervision And Consult
- Scope
- Shoring with 60 cm and 75 cm contiguous piles and ground anchors (exc height = 11.0 meter)
G10 - B+G+6 Plot No. 373-1352
Nov 2005 - Jan 2006
- Location
- Al Barshaa First
- Main Contractor
- Zetas Foundation Technology
- Consultant
- Arif & Bintoak Consulting Architects & Engineering
- Scope
- Bored piles with 60 & 75 cm L= 17 meter
G9 - 2B+G+10 Plot No. CBD-13
October 2005 - November 2005
- Location
- Al Warsan
- Main Contractor
- Zetas Foundation Technology
- Consultant
- National Enginering Bureau
- Scope
- Shoring with steel profiles
70 cm contiguous piles and ground anchors (exc. height = 8.0 meter)
G8 - London Crown 3 Project Plot No. 317-1051
Oct 2005 - Feb 2006
- Location
- Mankhool
- Main Contractor
- Al Shafar Transport and Contracting Co.
- Consultant
- Arenco Architectual and Engineering Consultants
- Scope
- Shoring with steel profiles and ground achors
Bored piles with 100 & 75 cm L=12 m
Pile load tests dynamic & integrity & sonic coring tests
G7 - Building Project (B+G+1)(5 Villa) Dubai Plot No. 322-123
Aug 2005
- Location
- Mankhool
- Main Contractor
- Bin Ghannam Contracting
- Consultant
- Eng.Adnan Saffarini Design, Supervision and Consult
- Scope
- Shoring with steel profiles (exc. height = 4.0 meter)
G6 - 2B+G+4 Office Building Plot no. A-009-009
Sep 2005 - Oct 2005
- Location
- Dubai Media City
- Main Contractor
- Geomar Gulf LLC
- Consultant
- Al Maktab Al Asri Eng. Consultant
- Scope
- Shoring with steel profiles and ground anchors (exc. height = 8.0 meter)
G5 - Commercial & Residential Building Plot no. 319-207
Jun 2005 - Aug 2005
- Location
- Oud Metha
- Main Contractor
- Al Shafar National Contracting
- Consultant
- Design and Architecture Bureau Consulting Architects and Engineers
- Scope
- Shoring with steel profiles and 50 cm contiguous piles
Bored piles with 60 & 90 dia L= 12 meter
G4 - 11 Tower with Podium
Apr 2005 - May 2005
- Location
- Business Bay
- Main Contractor
- Al Habtoor STFA Soil Group LLC
- Consultant
- Design and Architecture Bureau Consulting Architects and Engineers
- Scope
- Bored piles (Tower G Area) with 120 cm L= 26 & 35 meter
G3 - The Palm Island Shoreline Apt. and Club Houses Project
Oct 2004 - Jan 2005
- Location
- Palm Island, Jumeriah
- Main Contractor
- Bin Belaila Baytur LLC
- Consultant
- Associated Consulting Engineers (ACE)
- Scope
- Bored piles with 90 & 60 cm L= 20 meter
Pile Load tests, dynamic & integrity tests
G2 - Building Project Plot No. C-003-007
Sep 2004 - Oct 2004
- Location
- Tecom Area C
- Main Contractor
- Stromex Emirates Foundation LLC
- Consultant
- Al Wasl Al Jadeed Consulting
- Scope
- Bored piles with 90 cm L= 24 meter
G1 - Cascades Project Plot No. 392-459
Aug 2004 - Oct 2004
- Location
- Dubai Marina
- Main Contractor
- Al Shafar Transport & Contracting Co.
- Consultant
- Arif & Bintoak Consulting Architects & Engineering
- Scope
- Shoring with steel profiles
Bored piles with 90 and 60cm L= 27 meter
Pile load tests, dynamic and integrity tests